5 ReportsClear all

South EastAvante Homes: Fabric performance and occupancy feedback

The aim of the Avante BPE study was to learn lessons in hindsight in order to improve future housing design, development and management within Crest Nicholson leading to improved customer products and services. Overall, there have been a number of positive...
  • Domestic
  • Private

LondonCamden Passivhaus

This two-storey dwelling north London was completed at the end of 2010. It was designed to meet Passivhaus standards and ike other passivhaus homes, it has mechanical ventilation with heat recovery, extremely good insulation and airtightness, high performance...
  • Domestic
  • Private

LondonCamden Passivhaus

Detailed monitoring during the Phase 2 study of the Camden Passivhaus has found that the building is performing even better than designed and is providing a comfortable and healthy home. Good fabric design (good insulation, triple glazing, draft free...
  • Domestic
  • Private

ScotlandPlummerswood

Plummerswood is a Passivhaus Certified building designed on ecological design principles to create a healthy, comfortable, energy efficient home. The aim was to use mechanical systems only in so far as they were necessary and to ensure that they were...
  • Domestic
  • Private

South EastCentenary Quay In-use and Post Occupancy Study

This is an in-use performance analysis and post-occupancy evaluation of three monitored dwellings constructed as part of the first phase of Centenary Quay development near Southampton. The 3 terraced houses studied are constructed to Code 3 using load...
  • Domestic
  • Private